Got a lot done today with the sas project till the rain rolled into fallbrook and kinda stopped production cause let's just say welding in water just didn't seem like a good idea.
Here's what I got done
Transfer case mount the ends will be welded to frame then it will bolt in similar to trans mount.
Up in the frame
And the front axle in place and measured up for the links
(Pic pipe used only for eye balling)
Upper link area
And the rear axle is almost ready but ran into an issue with one of the the parts in the kit so that will be fixed soon.
Sent from my SCH-I605 using Tapatalk