Hi all,
For those of you running the Shrock front and rear, how long did the install for each take? I ask because I got a rather large labor quote from the boys at ORW in Temecula. I'll also drop in my Ironman 12K winch on the front.
My understanding is, everything is pretty much plug an play and should bolt up directly.
Thanks for the replies.